General
- Interface available in Romanian language.
Geometry
- When you copy-paste bar-properties using the right mouse button (in the geometry configuration), also copy the data behind the “Reinforcement dialog” (= the concrete cover, reinforcement distribution, …).
- Shortcut i or I for opening the Intersection dialog
.
Shortcut c or C for opening the Label & Comment dialog.
The full list of shortcuts in Diamonds can be found here.
Shortcut l or L for drawing lines. In the past it was already possible to draw lines using a or A. Both shortcuts can be used.
- Possibility to draw an ellips using the button
.
- Dialogs for material
and cross-sections
are provided with navigations buttons at the bottom. This should make the dialogs load faster.
Results
- Additional export options in results table
allowing you to export :
- only the current combinations (which was already possible in the past).
- the results of all combinations (new).
- the reuslts of all combiantions within the selected set (new).
If you’re looking at the results for SLS RC 2, and you select this option, all SLS RC results will be exported.
An overview of the current possibilities of the results table can be found in this article.
Concrete
- Possibility to export intermediar reinforcement results for bar elements.
The workflow, an overview of the current export possibilities and more can be found in this article.
Connections
- Send RHS splice from Diamonds to PowerConnect.
Export/ Import
- Import from SAF file via BIM Expert.
- Export to IFC file via BIM Expert.
General
- Bugfix in Auto Save-function.
- Bugfix in Save-function in combination with Section Utility. Diamonds always started the Save As-function instead of the Save-function.
- Possibility to assign Design types
to lines without cross-sections without them dissapearing after a while.
- Diamonds will no longer make sounds when you use ENTER and ESC while drawing.
Loads
- Bugfix in the calculation of the torsional reinforcement.
Results
- Bugfix in displaying enveloppe of cracking widths.
Concrete
- Bugfix in the calculation of the torsional reinforcement.
- Bugfix in calculation of cracked deformation.
- Bugfix in calculation of cracking widths.
Concrete + fire
- The reduced Young’s modulus used to calculate the reinforcement in case of fire, was taken too conservative.
Steel / timber
- Manually imposed duration class didn’t affect kmod.
Report
- Error when making print preview of detailed results of steel/timber verification.
- Right margin for print preview not working properly.
- “Out of resources” error when making a report.
- Page number starts at zero for steel/timber check.
- Model not visible in report manager.
This was in particular an issue on computers with an AMD Radeon Ryzen processor with integraded graphical card or on computers running a Virtual Machine.